Below you will find a collection of videos displaying major project updates and milestones.
Behind The Scenes of the Broadway Curve Improvement Project
-
2024
+ -Sept. 9, 2024 – I-10 BWC Project Completed Benefits
Aug. 21, 2024 – Soil Nail Walls
July 9, 2024 – Lightweight Sound Panels
June 4, 2024 – The I-10 BWC Improvement Project’s Last Bridge Girders Placed
April 18, 2024 – I-10 Alameda Drive Multi-use Bridge Art
March 14, 2024 – New Broadway Road on-ramp at westbound I-10
Feb. 23, 2024 – Constructing Concrete Barrier Walls Using the Slip-forming Method
Jan. 17, 2024 – Making Concrete Bridge Girders
-
2023
+ -Dec. 27, 2023 – 2023 I-10 Broadway Curve Improvement Project Wrap-up
Dec. 11, 2023 – Tempe Drain
Nov. 15, 2023 – Interesting Project Facts
Oct. 26, 2023 – Multiuse Bridges
Sept. 21, 2023 – I-10 Southern Avenue Bridge
Aug. 28, 2023 – Long Term Ramp Closures: 32nd and 40th Street
Aug. 3, 2023 – First half of 2023 project milestones
July 3, 2023 – Canvassing
June 23, 2023 – Alameda Multiuse Bridge
June 1, 2023 – WB US 60 – WB I-10 Ramp
May 16, 2023 – Dual HOV Bridges
April 17, 2023 – 48th Street and Broadway Road Removals
March 21, 2023 – The Mule Robotic Arm
March 8, 2023 – Women in Construction Week
March 1, 2023 – Project Inspectors
Jan. 31, 2023 – I-10 Salt River Bridges
Jan. 17, 2023 – Year in Review (2022)
-
2022
+ -Dec. 28, 2022 – MSE Walls
Dec. 14, 2022 – The Curve App
Nov. 30, 2022 – CD Roads
Nov. 15, 2022 – Recycled Materials
Oct. 25, 2022 – Shoofly
Oct. 12, 2022 – Surveyors
Sept. 6, 2022 – 48th Street Bridge Deck Pour
Aug. 23, 2022 –Overexcavating
Aug. 9, 2022 – Soffit fill
July 19, 2022 – Guadalupe Road Bridge
July 6, 2022 – Cranes and Beams
June 22, 2022 – Wattles
June 1, 2022 – Design Story
May 17, 2022 – Surcharge Soil
May 4, 2022 – North Pole
April 22, 2022 – Plant Nursery
April 5, 2022 – AC Paving
March 22, 2022 – Community Office
March 8, 2022 – Flagging Operations
Feb. 22, 2022 – Concrete Pour
Feb. 8, 2022 – How the work zone has shifted on westbound I-10 at 32nd Street
Jan. 25, 2022 – How is rebar used in drilled-shaft bridge foundations
Jan. 11, 2022 – What are drilled-shaft foundations
Project Videos
-
2024
+ -Sept 2024: Salt River bridges
Sept 2024: Westbound I-10 activities
Sept 2024: Westbound I-10 on-ramp at 32nd Street
Sept 2024: 48th Street, north of Broadway Road
Aug 2024: Southbound SR 143 ramp to eastbound I-10
Aug 2024: Overhead freeway sign installation
Aug 2024: I-10/SR 143 HOV ramps
Aug 2024: Westbound CD Road near US 60
July 2024: SR 143 HOV bridge
July 2024: Northbound lanes of SR 143
July 2024: Westbound I-10 on-ramp at 32nd Street
July 2024: Alameda Drive Multiuse Bridge
June 2024: Southbound SR 143 bridge to eastbound I-10 deck paving
June 2024: SR 143 ramp work
June 2024: SR 143 bridge walls
May 2024: Northbound SR 143
May 2024: CD Roads
May 2024: Paving between Elliot and Baseline roads
May 2024: MSE walls
May 2024: Salt River bridge
May 2024: Salt River bridge deck pour
April 2024: MSE walls in median
April 2024: Eastbound 32nd Street off-ramp
April 2024: 48th Street/Broadway Road ramp
April 2024: I-10/SR 143 bridge work
March 2024: Various Broadway Road work
March 2024: Barrier work on CD Road
March 2024: I-10 and SR 143 bridge work
March 2024: Pavement removal on I-10 under Broadway Road
February 2024: HOV ramps from connecting I-10 and SR 143
February 2024: Diaphragm pour at Salt River bridge
February 2024: Removal of eastbound I-10 on-ramp at Broadway Road
February 2024: Salt River bridge girders (westbound II)
January 2024: Salt River bridge girders (westbound)
January 2024: Alameda multiuse bridge
January 2024: Concrete barrier along SR 143
January 2024: SR 143 ramp at University Drive
-
2023
+ -December 2023: Median drilled shafts for I-10 and SR 143 ramps
December 2023: Setting girders for eastbound CD road bridge over Southern Avenue
December 2023: Crew ties rebar constructing a steel column (caisson)
December 2023: Paving preparation for paving eastbound CD Road near Southern Avenue
November 2023: Median barrier removal
November 2023: Excavation and grading next to I-10 near Diablo Way
November 2023: Pavement preparation near eastbound I-10 on-ramp at 40th Street
November 2023: SR 143 and I-10 New Pavement
October 2023: I-10 on-ramp at 40th Street Paving
October 2023: 32nd Street Drainage
October 2023: I-10/US 60 Drainage
October 2023: 40th Street retaining walls
October 2023: Salt River Bridge
September 2023: Barrier wall between 32nd and 40th streets
September 2023: I-10 on-ramp at Broadway Road (MSE) wall
September 2023: SR 143 HOV Ramp to I-10
September 2023: Guadalupe Road Bridge
August 2023: Eastbound I-10/ 32nd Street on-ramp
August 2023: SR 143/I-10 HOV Ramp
August 2023: Westbound I-10/40th Street off-ramp
August 2023: I-10/32nd Street on-ramp
July 2023: SR143 to the eastbound I-10 Collector-Distributor (CD) road bridge girders
July 2023: Westbound 40th Street Off-ramp
July 2023: Excavating WB I-10 Ramp to NB SR 143
July 2023: WB I-10 Ramp to NB SR 143
June 2023: Alameda Drive Multiuse Bridge
June 2023: 40th Street MSE Walls
June 2023: Westbound US 60 to Westbound I-10 Bridge
June 2023: Broadway Road Area Dirt Work
May 2023: Broadway Road Bridge Removal
May 2023: Rubberized Asphalt Paving
May 2023: Rubberized Asphalt Paving
April 2023: A crew removes the old 48th Street bridges over I-10
April 2023: Excavation and drainage work on the new westbound I-10 on-ramp at 40th Street
April 2023: Broadway Road and 48th Street Bridge Removals
April 2023: SR 143 Bridge to the Eastbound Collector-Distributor Road
April 2023: I-10 Connector Ramp Between 48th Street and Broadway Road
March 2023: SR 143 Ramp to I-10
March 2023: 48th Street Bridge
March 2023: 40th Street Ramp
March 2023: 32nd Street
February 2023: SR 143 Bridge
February 2023: Broadway Road Bridge
February 2023: Salt River Bridge
February 2023: Westbound I-10/Eastbound US 60 Ramp
January 2023: State Route 143/48th Street Bridge
January 2023: 48th Street Bridge Work and Paving
January 2023: Earthwork
January 2023: US 60/Westbound I-10 Mechanically Stabilized Earth (MSE) Wall
January 2023: Salt River Bridge Drilled-Shaft Foundation
-
2022
+ -December 2022: Salt River Bridge
December 2022: Mechanically Stabilized Earth (MSE) Wall
December 2022: Eastbound I-10 at Salt River Bridge
December 2022: SR 143 Mechanically Stabilized Earth (MSE) Wall
December 2022: SR 143/I-10 HOV Drill Shaft
December 2022: SR 143/I-10 HOV Bridge Drilling
November 2022: SR 143/I-10 HOV Bridge Drill Shafts
November 2022: Northbound SR 143/I-10 Ramp Reconfiguration
November 2022: Broadway Road Bridge Deck Pour
November 2022: Broadway Road Bridge Deck Pour
October 2022: 48th Street Bridge Deck Pour
October 2022: Southern Avenue Bridge Deck Pour
October 2022: Eastbound I-10 Miscellaneous Construction
October 2022: Eastbound I-10 on-ramp at 40th Street
September 2022: Eastbound I-10 Rubberized Asphalt Paving
September 2022: Southern Avenue
September 2022: Dynamic Message Board installation
September 2022: Sound wall removal near Southern Avenue
August 2022: 48th Street bridge deck pour
August 2022: State Route 143 work zone set up
August 2022: Western Canal multiuse bridge
August 2022: Temporary Broadway Road ramp paving
July 2022: Broadway Road girders
July 2022: Temporary concrete barrier
July 2022: Broadway Road girders
July 2022: Broadway Road girders
June 2022: Broadway Road girders
June 2022: 48th Street backfill
June 2022: Bridge barrier
June 2022: Broadway Curve girders at 48th Street
May 2022: Workers backfill and compact the backfill material on 48th Street near Medtronic Way
May 2022: Crews continue to relocate utilities along 48th Street and place concrete to build a column at Alameda Drive
April 2022: Work continues to relocate utilities along 48th Street
April 2022: Workers are building new sound walls along I-10, south of Guadalupe Road
April 2022: Workers dig in preparation for utility relocation along 48th Street
April 2022: Loader conducted earthwork near the new 48th Street bridges over I-10
March 2022: Workers remove the 48th Street frontage road bridge
March 2022: Workers place concrete paving on eastbound I-10 south of Guadalupe Road
March 2022: Workers move an existing light pole to a new location
March 2022: Asphalt paving on eastbound I-10 south of Baseline Road
March 2022: Construction of the new 48th Street bridges over I-10 continues
February 2022: Drilled-shaft foundation installation for the Alameda multiuse bridge over I-10
February 2022: Construction of the new Broadway Road bridge over I-10 continues
February 2022: Workers pour concrete for light pole foundations near 40th Street
February 2022: Workers lower a rebar cage into a drilled shaft with a crane
-
2021
+ -December 2021: Drilled-Shaft Foundations
November 2021: Median Glare Screen Concrete Pour
August 2021: Rubberized Asphalt Removal Work
August 2021: Project TV commercials
June 2021 – Geotechnical work, a necessary step before construction can begin.