2025: Crews reconfigured the I-10 interchange with 32nd Street.
2021: I-10 looking eastbound
2025: I-10 looking eastbound. Crews constructed two new multiuse bridges, one at Alameda Drive and one at the Western Canal, to provide safe new crossings for pedestrians and cyclists over the freeway.
2021: I-10 at US 60
2025: I-10 at US 60.Crews constructed the CD roads between Baseline Road and 40th Street to separate through-traffic on I-10 from local traffic entering or exiting the highway.
2021: I-10 at the Broadway Curve.
2025: I-10 at the Broadway Curve.Crews replaced the Broadway Road bridge over I-10 to make room for the Collector-Distributor (CD) roads and the new interchange with State Route 143.
2021: I-10 at 32nd Street.
2025: I-10 at 32nd Street.Crews widened the Interstate 10 bridges over the Salt River to make room for six general purpose lanes and two high-occupancy vehicle (HOV) lanes in both directions.