Both halves of the multiuse bridge truss near the Western Canal are now in place over Interstate 10 between Baseline Road and US 60. Crews will next begin constructing the bridge deck and the ramps leading up to the crossing.
A paving crew places asphalt as the pavement base layer near the eastbound I-10 on-ramp at 40th Street.
Vibratory rollers compact the asphalt in preparation for placing the next layer of concrete pavement near the eastbound I-10 on-ramp at 40th Street.
A row of trucks filled with asphalt lines up as part of the widening of the westbound lanes of I-10 near 32nd Street.
A paving crew places asphalt as the pavement base layer next to the westbound I-10 on-ramp at 32nd Street.
A cast in place concrete wall pour at the Western Canal for the widening of the westbound I-10 ramp to eastbound US 60.
Crews are constructing the eastbound CD road bridge that will cross over the eastbound I-10 off-ramp at Baseline Road.
A worker driving a concrete saw cuts grooves into the future I-10 westbound mainline near State Route 143. The grooves help prevent any future cracks from spreading, making repairs easier.
Pouring concrete into a wall form next to the ramp from westbound I-10 to eastbound US 60.
The bridge that will directly connect the HOV lanes between I-10 and State Route 143 continues to take shape.